Selected borrow for topping case 1
Web1.00 6.65 1.00 305.29 68.12 730.98 5.00 2.00 5.00 1.00 665 1.00 260.94 68.12 651.33 Each MO M3 M3 M3 M3 Part B B.8(1) B.7(1) 8.9 Part A 101(1) 102(2) Other General R uirements Traffic Mana ement Project Billboard/Signbo ard Occupational Safety and Health P ram Mobilization/De mobilization Earthwork Removal of Concrete Bridge Structures (Sidewalk, Web1700(1 1700 1707(1) 1712(1) 1719 3 801(1) Clearing and Grubbin Individual Removal of Trees, 150-300rnm dia., Structure Excavation, Common Soil A regate Subbase Course Bed Course Granular Material Granular Backfill Filter Material for Underdrains Removal of Actual Structures/Obstructions Selected Borrow for Topping, Case 1
Selected borrow for topping case 1
Did you know?
WebPage 1 of 2/boq rev 1 rev 1 ITEM NO. QUANTITY UNIT Part-A FACILITIES FOR THE ENGINEER ... a Selected Borrow for topping, case 1 per cu.m. 28.00 cu.m. 105(1)a Subgrade Preparation (common materials) per sq.m. 138.00 sq.m. Part D SUBBASE AND BASECOURSE 200(1) Aggregate Subbase Course (for intermittent reblocking) ... Web1.00 0.65 2.00 16.00 16.00 1.00 16.00 470 nn 801 (1) Removal of Structures and Obstructions 804(2)a Selected Borrow for Topping, Case 1 804(2)b Selected Borrow for Topping, Case 2 OTHER GENERAL REQUIREMENTS B.4(1) Construction Survey and Staking Project Billboard / Signboard B.5 B.7(1) Occupational Safety & Health Program B.8(1) …
WebTHE BIDS WERE OPENED AS SCHEDULED ON JUNE 29, 1964, AT THE BUREAU OF PUBLIC ROADS IN PORTLAND, OREGON. THE MCEWEN BID AT $478,401.85, WAS THE LOWEST … Web1.00 10.00 680.00 951.00 492.00 973.00 Unit cost (Peso) 637.06 770.62 59.88 63.12 AMOUNT 453, 145.00 2, 171 ,540.40 Page I of 4 The calculated unit bid prices: ITEM NO. / DESCRIPTION EARTHWORKS 801(1) Removal of Structures and Obstructions Selected Borrow for Topping, Case 1 804(2)b Selected Borrow for Topping, Case 2 OTHER …
WebNov 17, 2024 · 1043a selected borrow for topping case 1 2000 cum School San Isidro College - Malaybalay City, Bukidnon Course Title ACCOUNTING 01 Uploaded By … Web2 Suitable A Selected Borrow for Topping - gradation that all particle will pass sieve 75mm (3 inches) and not more than 15 mass percent will pass 0 (no) sieve B 3 Unsuitable A B natural water content exceeds 100% C natural density 800 kg/cu max. Trees diameter will be measured 1 from the ground and a diameter less than 150mm will not be ...
Web104(1) Selected Borrow for Topping Case-I (Side Borrow) cu.m. 167.95 404 405(1) Structural Concrete Class A cu.m. 65.49 505(5) Grouted Riprap, Class A cu.m. 14.85 SPL …
WebOct 23, 2014 · Embankment Selected, Borrow for topping, Case 1 Selected Borrow for topping, Case 2 Earth Berm. Item 105 SUBGRADE PREPARATION 105.1 Description This Item shall consist of the preparation of the subgrade for the support of overlying structural layers. It shall extend to full width of the roadway. Unless authorized by the Engineer, … crowne plaza 260 mall blvd king of prussiaWeb104 (2) Selected Borrow for topping, Case 1 Cubic meter 208 Aggregate Stockpile (average end area method) Cubic meter 104 (3) Selected Borrow for topping, Case 2 Cubic meter 104 (4) Earth Berm Meter * Includes compaction PART E – SURFACE COURSE * Includes compaction 105 Subgrade Preparation 300 Aggregate Surface Course Cubic meter crowne plaza 1015 elm street dallas txWebSelect borrow consists of granular material, either naturally occurring or processed, and contains no more than 5% clay, organic debris, or trash by volume. Select borrow material must be free of rocks greater than 6 inches in any dimension. Sample 1 Sample 2 Sample 3 See All ( 4) SELECT BORROW. building design chittagong